Environmental Incinerator

Incinerator shall be used to burn all non biodegradable wastes generated personnel in the mission area and convert into ash so that waste
can be managed in an environmentally safe manner.

Using the General Requirements and specific requirements on this section, the contractor shall supply, install, commission, and
provide training and spare parts (for scheduled one year) of an Incinerator.
The contractor shall supply, install, commission, and provide training and spare parts (for scheduled one year) an incinerator camps. The
proposed Incinerator should have the following specification parameters or approve equal. Bidder should elaborate the proposed variance of
any portion of this specifications and the impact it might have on the desired general propose of the incinerators.

WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters

Nanjing Clover Medical Technology Co.,Ltd.

Tel: +86-25-8461 0201
Mobile: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com
Email: sales@hiclover.com
Email: hicloversales@gmail.com

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: